Skip to Content
Human resourcesRWR Working schedules

RWR Working schedules

rwr_work_schedules version 19.0.1.0.3 depends on hr. It creates and reconciles RWR working schedules, matching contract templates, and the employee Personnel Number field. All schedules use the Europe/Berlin time zone.

Managed schedules

Working ScheduleHours/week
Single Shift 37.5 h Technical Assembly37.5
Single Shift 38 h Technical38
Single Shift 35 h Production35
Single Shift 35.5 h Production35.5
Single Shift 38 h Technical (A Variant)38
Single Shift 38 h Administration38
Single Shift 5.5 h Daily Administration27.5
Single Shift 5 h Mon-Thu Administration20
Temporary Staff41.75
Drivers9.5
Cleaning - Temporary Staff7
2 Days/Week 16.5 Hours16.5
Single Shift 24 h Production24
Single Shift 38 h Technical Pool38
Management 40 h40
38 h Administration38
Single Shift 38 h Technical Assembly38

On installation, the module reuses a same-name schedule in the current company or creates it, then replaces its working-time intervals with the maintained definition. It also creates or updates a company-level contract template named RWR - <Working Schedule>.

Assign a schedule and Personnel Number

  1. Open Employees and select the employee.
  2. Enter the employee’s Personnel Number.
  3. Open the employee’s current contract/version and select the appropriate Working Schedule.
  4. Save and verify the schedule’s time zone and intervals in Employees > Configuration > Working Schedules.

Use the matching RWR - … template when preparing a contract/version. If no listed schedule fits, create a separate native schedule rather than changing a managed RWR schedule without confirming the impact of the next module upgrade.

Attendance tolerance

Native Odoo working schedules define planned working intervals and breaks. Any overtime or tolerance behaviour remains native Odoo configuration. There is no separate early-arrival or late-departure tolerance field in this module.

The schedule drives Worked Time requests, Attendance report, and eligibility for Absence detection access, so keep it assigned and current.

Verify

Use a test employee with a matching contract/version. Confirm the schedule in the employee record, the RWR - … template, and the expected planned hours in the Attendance report for a scheduled day.